Assembly: 35 tonnes of material for one booth.
Early at 8:00 a.m., the first harbinger carefully rolls into the yard - so it's getting serious. It is the first of a total of 4 truck-trailer units to pick up the material that has been pre-produced for weeks for the exhibition stand of >>> Elten at this year's A+A.
7 hours later, 42 loading metres of stand construction material are safely stowed on the 4 truck-trailer units and it's off to the Düsseldorf trade fair.
We have recorded what we do there in figures. Curious? Then read on:
A few figures from the trade fair assembly.
Our 20-strong assembly team built 554 m² of stand space plus 100 m² of double decks in 7 days. And this is what they moved with their hands:
- 35 tons of stand construction material
- 130 running metres of truss system
- 150 litres of paint
- 33 metal construction fences
- 8 displays made of real wood planks, illuminating 2,400 LED points
- 39 large-format graphics
- 2,300 metres of power cable
- 18 metres of bench seating
- 154 pieces of seating furniture
- 4,000 screws
- 5 x 2 metre high 3D logo letters
One week after the start of assembly, our team welcomes the Elten stand team to the handover of the trade fair stand. Thanks to the great commitment of the entire HALLMANN team, the stage is now set for the real stars of the fair: Clear the stage for the real stars of the exhibition stand: 723 models of Elten work shoes.
Best Regards
Yours, Petra Hallmann